TimeTodayWith the system
06:00147 unread across 15 groups, read before leaving home.Daily digest: 5 jobs today, 1 cert expiring, 2 PTWs needed.
06:45Calls the dorm for a headcount: who’s coming?Workers check in via the site number.
07:30Paper toolbox meeting. Two names unreadable.Toolbox on the phone, geofenced sign-in. Briefing voice note in Bengali, Tamil and Mandarin.
07:45PTW “sign later”: PM not on site, work at height starts anyway.Assessor checks on site; the PM issues the PTW from his phone, with photos.
10:00MA calls: “Status for Blk 128A?” Scrolls five groups for photos.MA checks the portal. No call.
12:00“Can add?” Extra corridor crack agreed verbally.VO drafted from the message. PM approves; client confirms in writing.
13:00Hot afternoon. WBGT not logged.Bot asks for the hourly WBGT reading. Logged.
14:00Boss calls: needs photos for this month’s claim.Claim pack ready. Missing-items list: none.
15:30Harness inspection overdue. Crew stopped.Harness replaced last week; it was flagged 14 days ago.
17:00Workers leave. “After” photos scattered across 5 groups.Photos already filed by job, area and stage.
17:30Still on site, chasing the last photos.Completion report generated; reviewed in ~10 min (sample).
18:30Drives to the office to sign forms.Home.
20:00Retyping attendance into Excel.—
21:00Building the report in Word: dragging 40 photos into a template.—
22:00One worker’s phone is dead. A photo is missing; the claim slips. Home ~22:30.—
Illustrative day built from our discovery interviews. The ~4 hours is our estimate, not a measured result.